Introduction

In March 2001, Middlegrunden in Denmark became the world’s largest offshore windfarm. Estimated annual production is 85,000MWh, equal to 3% of Copenhagen’s total consumption. 20 Bonus 2MW turbines are placed 180m apart in a curve, with a total windfarm length of 3.4km.The windfarm was developed off the Danish coast by a consortium of Københavns Energi and Middelgrundens Vindmøllelaug. The two partners own ten 2MW turbines each in Middelgrunden.The turbines are equipped with a modified corrosion protection, internal climate control, high-grade external paint and built-in service cranes. Middelgrunden was previously used as a filling up area with a water depth of 2m-6m.

Reason to Be Selected

Offshore wind turbines have major technical requirements due to the more demanding climatic environmental exposure offshore, with greater risks of structural corrosion. In addition, there is the greater problem of access during bad weather, and greater expense when replacing larger main components. Wind turbines for offshore sites therefore require increased corrosion protection, with reduced maintenance and service requirements and an improved supervision and control system.The exterior corrosion protection of the various steel components (nacelle cowlings, tower, etc) features a paint system fulfilling the standards required for North Sea offshore installations, drilling rigs and platforms. The surface of the fibreglass blades is similar to fibreglass boat hulls and therefore requires no additional corrosion protection for offshore use.

Highlights:

“The main electric components (generator, control systems, etc) have standby heating systems, preventing condensation, even during sudden variations in temperature.”

Details

Interior corrosion protection comes from improved painting systems and maintaining a dry environment inside the machine. A pre-requisite for a dry interior environment is a sealed machine. The gear and generator are cooled by heat exchangers recycling the air used in the air-cooling system, instead of conventional air-cooled components on earlier turbines.

To maintain low interior air humidity, de-humidifying devices were placed in the tower and nacelle room. The de-humidifying system maintains the interior relative humidity below the limit of any steel corrosion risk limit (60%). For additional protection, the main electric components (generator, control systems, etc) have standby heating systems, preventing condensation, even during sudden variations in temperature.

Gravitation foundations had to be constructed for the towers, which are up to 64m in height, on which the 76m-diameter rotors operate. With hybrid (steel and concrete) construction, the egg-cup shaped sockets on cylindrical bases have a ballast effect.
PERI supplied two formwork sets with 11 segments for the uniform dimensions of the ice reinforcement caps (foundation caps) and different shaft units. These could be adjusted to the different shaft heights through simply extending or reducing the units. The whole shell, exactly reproducing the required concrete shape, was retained in a closed formwork ring with GRV articulated walings. The highest concreting speeds are therefore possible without any ties.

The turbine’s lubrication system has been adapted to increase service intervals. Many bearings, including the blade bearings, are lubricated with an automatic greasing system. A special gearbox oil filter, separate from the normal oil cooling system, ensures high oil cleanliness. A pre-heating and cooling system maintains gear oil temperature within a narrow temperature range.To reduce workload during service and maintenance operations, the turbine is equipped with two nacelle-mounted hydraulic cranes. These cranes allow tools and spares to be lifted from sea level and placed anywhere on the wind turbine. If these built-in cranes lack the necessary lifting capacity, they can be used to install a large transportable crane, capable of lifting the heaviest main components (blades, gearbox, and generator).

 

FULL STORY:
The installation of a computer in every wind turbine, each with its own email address, allows communication to and from the turbine using a conventional Internet browser. The network-based monitoring system has advantages over other more traditional supervisory systems. During service and maintenance, fitters can download special drawings, diagrams or manuals. As the wind turbine has its own email address, rapid discussion of any problem is possible between the service and maintenance department and the suppliers of individual components. The new system also offers rapid and precise regulation of the total supply of electrical power to the grid from the Middlegrunden project, based on feedback from the electrical transmission company.The computer for the network-based monitoring system is connected to the wind turbine control system. However, the control system continues to function in the event of a monitoring system fault.


Lat: 55.6713
Lng: 12.5608
Type:
Region: Europe
Scale: District
Field: Environment
City: Copenhagen